Analisis Faktor-Faktor Penyebab Perbedaan Estimasi Biaya Awal Dengan Biaya Pelaksanaan Proyek Konstruksi Di Lingkungan Kampus Politeknik Negeri Padang

Monika Natalia • Yan Partawijaya • Satwarnirat Satwarnirat • Rahmi Hidayati • Hartati Hartati

Unduh teks lengkap
(Bahasa Indonesia, 11 pages)

Abstrak

The difference preliminary cost estimate often do so at the cost of implementation of construction projects. Likewise with construction projects in the country Polytechnic Padang. The research that has been conducted found that the factors that cause differences in the cost of government policies change often with a contribution of 2.221%, 1.487% of the project schedule, a change of plans for the implementation of the project amounted to 1.098%, 1.036 criteria for project drawings %, review the design of 0.955%, the first disbursement of funds are not clear 0.850%, the processes of implementation on the ground of 0.720%, rising material prices rising by 0.614% and 0.550% of wages.

Metrik

  • 272 kali dilihat
  • 45 kali diunduh

Jurnal

Jurnal Rekayasa Sipil Politeknik Negeri Andalas

Jurnal Rekayasa Sipil Politeknik Negeri Andalas adalah jurnal akses terbuka yang menerbitkan pene... tampilkan semua