In this research, Cengkareng substation serves the burden which in every year is increasing. So in this study a system of estimating the load power at the substation was made as a result of forecasting for the following year using the Time Series Decomposition model method which was then analyzed from the existing transformer capacity. The Time Series Decomposition model method is a method of combining Trend, Seasonal and Cycle to predict the electrical load power of a substation. In this study, the development of the system uses the CRISP-DM method so that the work becomes more ordered and the testing is done with MAD, MSE and MAPE to verify the error value in the forecasting results. From this study, it produces an error value of MAD and MAPE of 9.11%. These results, prove that the Time Series Decomposition model method can be used to assist in estimating the Power Load in Cengkareng Substation.

Metrics

  • 28 kali dilihat
  • 8 kali diunduh

Jurnal

Jurnal Teknologia

Jurnal Teknologia merupakan bagian dari Aliansi Perguruan Tinggi Badan Usaha Milik Negara (APERTI... tampilkan semua