Journal article
The basic of this project was installation of new CSD (carbonated soft drink) RGB (returnable glass bottle) line with comply food safety and final validation of line. New manufacturing line installation deals with installation of all equipment and machine require for smooth running and producing CSD for COCA-COLA company (Coca-Cola, Thums UP, Limca) such as conveyer belt, uncasing machine, light inspection station, bottle washer EBI (electronic bottle inspection ) machine, Paramix, Filler, Sealer, Date coding machine, caser etc. During installation of machine we have fulfill requirement related to machine, work space, hygienic condition so that machine can work smoothly and deliver safe food product The main concern of doing this project was deliver a safe product to the consumer by applying HACCP and ISO22K. I have done hazard analysis and validation of this new installed line and identify CCP and OPRP which need to control by applying control measure.