Study Information System Scheduling Based on Procurement of Goods in Connection with the Goods in Inventory Control PT. Usi-jaya
1990
Sulwan Wahab, M. A. H. Soetirto Sadikin

Metrics

  • Eye Icon 113 views
  • Download Icon 26 downloads
Metrics Icon 113 views  //  26 downloads
Study Information System Scheduling Based on Procurement of Goods in Connection with the Goods in Inventory Control PT. Usi\u002Djaya Image
Abstract

One of the major factors that support the production is the supply of goods, inaddition to the human / labor, machinery, and capital. Duty management arranged forthe above factors can work together to produce maximum output with minimuminput. Inventories of goods other than as one of the major factors that support theproduction also is one of asset / capital for the company, it was necessary to have auntu for inventory control, therefore it is necessary to have a control for theinventory.

Full text
Show more arrow
 
More from this journal
Local Semi Automatic Clearing System (Sokz) on Bank Xyz
Local Semi Automatic Clearing System (Sokz) on Bank Xyz Image
🧐  Browse all from this journal

Metrics

  • Eye Icon 113 views
  • Download Icon 26 downloads
Metrics Icon 113 views  //  26 downloads