The risk analysis was carried out in a company dedicated to construction. In the first phase of the project, a diagnosis of the risks was made in which it was found, 30.3% of the works are performed in height, 15.8% of the activities carried out have the risk of falling materials, in the same way there was a risk of not use personal protective equipment and some psycho-physical factors.
The company must comply with the Mexican standards that apply and reduce the risks according to the degree of danger.